Floating Wind

La Pinta

Spain
La Pinta EN
Project Status
Estado del Proyecto
Estado do Projecto
Active
Partners
No items found.
Project Wesbite

The La Pinta project will utilise innovative and cutting-edge floating offshore wind technologies to produce zero-carbon electricity. This project aims to be a steppingstone for Spain to progress towards a net-zero future, which will contribute to the Spanish government’s target of 1-3 GW of installed offshore wind by 2030.

With a proposed 990 MW project size, the La Pinta project will be located on the coast of Granada and Almeria (Andalusia), in an area called ESAL2. The IberBlue Wind team have submitted the Initial Project Document (DIP) to the Ministry for Ecological Transition and Demographic Challenge (Ministerio Para La Transición Ecológica Y Reto Demografico - MITECO). This is a preliminary document that includes the intention to carry out the project and additionally, an environmental analysis on the technical feasibility of the project.

IberBlue Wind is committed to working together with civil society, coastal communities, government, and industry to reach a consensus, with the aim of benefiting the region while respecting the environment. Engagement with stakeholders linked to this project, including Junta of Andalucía, city councils, associations and other sea users, etc., with the aim of: listening, learning and informing.

Facts & Figures

Datos y Características

Dados e Características

La Pinta Sustainable Coastal Communities
Sustainable Coastal Communities
Comunidades Costeras Sostenibles
Comunidades Costeiras Sustentáveis

The largest floating offshore wind farm in Andalusia will contribute to the supply of clean energy in the region.

El mayor parque eólico marino flotante de Andalucía contribuirá al suministro de energía limpia en la región.

O maior parque eólico offshore flutuante de Andaluzia, vai contribuir para o abastecimento de energia limpa na região.

La Pinta Solid and Long-Term Investment
Solid and Long-Term Investment
Inversión sólida y a largo plazo
Investimento sólido e de longo prazo

An investment of > €2,500 million is estimated from the development phase to construction.

55% of the investment will be national.

Se estima una inversión de más de 2.500 millones de euros desde la fase de desarrollo hasta la fase de construcción.

El 55% de la inversión será nacional.

Estima-se um investimento de > 2.500 milhões de euros desde a fase de desenvolvimento até a construção.

55% do investimento será realizado a nível nacional.

Elcano Technical Design
Technical Design
Diseño técnico
Desenho Técnico

55 wind turbines of 18MW each, covering an area of 316 km2

55 floating platforms

Evacuation line buried in the earthen area.

29 aerogeneradores de 18MW cada uno, cubriendo un área de 117 Km2

29 plataformas flotantes.

Línea de evacuación enterrada en la zona de tierra.

29 aerogeradores de 18 MW cada, cobrindo uma área de 117 km2

29 plataformas flutuantes

O cabo de transporte de energia elétrica será enterrado até ao ponto de recepção de energia elétrica, localizado em terra.

La Pinta Employment Creation
Employment Creation
Creación de empleo
Criação de emprego

Nearly 3,000 during the development, construction and operation phase.

About 300 workers during the commercial phase.

Cerca de 3.000 durante la fase de desarrollo, construcción y operación.

Unos 300 trabajadores durante la fase comercial.

Quase 3.000 empregos durante a fase de desenvolvimento, construção e operação.

Cerca de 300 empregos durante a fase comercia.

La Pinta Low Carbon Power Generation
Low Carbon Power Generation
Generación Baja en Carbono
Geração de Energia de Baixo Carbono

La Pinta 990 MW > 670,000 homes supplied per year.

Los 990 MW de La Pinta darán electricidad a más de 670.00 hogares al año.

La Pinta 990 MW > 670.000 residências abastecidas por ano.

La Pinta Robust Technology
Robust Technology
Tecnología robusta
Tecnologia robusta

Operational life of floating wind farms > 25 years.

Vida operativa del parque > 25 años.

Vida operacional de parques eólicos flutuantes > 25 anos.

La Pinta Covered Area
Covered Area
Área Ocupada
Área Coberta

The project will cover an area of approximately 316 km2. The engineering team will optimise the design based on the final selected wind turbine and bathymetry.

El proyecto cubrirá un área de aproximadamente 316 km2. El equipo de ingeniería optimizará el diseño de acuerdo con la tecnología finalmente seleccionada y la batimetría.

O projeto abrange uma área de aproximadamente 316 km2. A equipe de engenharia otimizará o projeto com base na turbina eólica final selecionada e na batimetria do local.

La Pinta Distance to the Coast
Distance to the Coast
Distancia a la Costa
Distância até a costa

The distance will vary between 15-35km. Our intention is to limit the visual impact.

La distancia del parque a la costa varía de 15km a 35km. Nuestra intención es limitar el impacto visual.

A distância varia entre 15-35 km. Nossa intenção é limitar o impacto visual.

Our Commitment

Nuestro Compromiso

O Nosso Compromisso

Our Committment

IberBlue Wind's value proposition is based on an innovative business model that is respectful of the environment and committed to the development of the local communities in which it is established.

Our entrepreneurial vocation drives us to bet on offshore wind energy as one of the main ways to advance in the energy transition that the planet urgently demands.

Promote, listen and participate in meeting forums and social dialogue between the sectors involved such as fishermen's associations, promoters of offshore wind projects, local communities and the Administration.

La propuesta de valor de IberBlue Wind se basa en un modelo de negocio innovador, respetuoso con el medio ambiente y comprometido con el desarrollo de las comunidades locales en las que está implantada.

Nuestra vocación emprendedora nos impulsa a apostar por la energía eólica marina como una de las principales vías para avanzar en la transición energética que el planeta demanda con urgencia.

La premisa de IberBlue Wind es promover, escuchar y participar en foros de encuentro y diálogo social entre los sectores implicados como cofradías de pescadores, promotores de proyectos eólicos marinos, comunidades locales y la Administración.

A proposta de valor da IberBlue Wind assenta num modelo de negócio inovador, respeitador do ambiente e comprometido com o desenvolvimento das comunidades locais onde se insere.

A nossa vocação empreendedora leva-nos a apostar na energia eólica offshore como uma das principais formas de avançar na transição energética que o planeta exige urgentemente.

Promover, ouvir e participar em fórums de encontro e diálogo social entre os setores envolvidos como associações de pescadores, promotores de projetos eólicos offshore, comunidades locais e a Administração

Related Projects

Nuestros Proyectos

More Projects

Creoula
Floating Wind
Portugal
Read More
Juan Sebastian Elcano
Floating Wind
Spain
Read More
Nao Victoria
Floating Wind
Spain
Read More
Botafogo
Floating Wind
Portugal
Read More
Creoula
Eólica Flotante
Portugal
Read More
Juan Sebastian Elcano
Eólica Flotante
España
Read More
La Pinta
Eólica Flotante
España
Read More
Botafogo
Eólica Flotante
Portugal
Read More
Nao Victoria
Eólica Flotante
España
Read More
Creoula
Eólica Flutuante
Portugal
Read More
Juan Sebastian Elcano
Eólica Flutuante
Espanha
Read More
La Pinta
Eólica Flutuante
Espanha
Read More
Botafogo
Eólica Flutuante
Portugal
Read More
Nao Victoria
Eólica Flutuante
Espanha
Read More